Survey across the occupied floor
Elevation readings are taken through the building, worked around trading hours and stock where necessary.
Warehouses, retail units, offices and small industrial buildings sit on the same clay as the houses around them, and they move for the same reasons. The difference is that the building usually has to keep trading while the work happens.
Commercial jobs are as much about scheduling and access as about structure. Which areas can be closed, when work can be noisy, where equipment can stand and how racking or stock gets moved usually shape the program more than the repair method does.

Ask for scope to be agreed against the survey and the operating constraints of the building, and set out in writing for the owner, the tenant or both.
Elevation readings are taken through the building, worked around trading hours and stock where necessary.
Column loads, racking, tilt-wall panels and heavy equipment change where support is needed and how much it has to carry.
Work is divided into sections so parts of the premises stay usable, with access routes and closures agreed in advance.
Heavier loads and deep fill often call for supports driven further than a typical house repair requires.
Large roof areas, parking and paved aprons concentrate a lot of water near the building. Where it goes matters as much as it does at a house.
Ask for the readings, the placement plan, the method and the warranty terms in a form that a landlord, tenant or lender can review.
Support type is usually driven by load and depth: see how pressed concrete and steel piers compare and how supports are placed and spaced. Where movement has been mild, correcting site drainage around a large roof and parking area can be the more sensible first step.
For a commercial property an independent structural engineer evaluation is often expected by a lender, an insurer or a landlord, and it gives you a scope to price rather than a proposal to accept. Ask whether the provider will work to one.
Start with the survey, read how the process runs, see coverage in North Richland Hills or across the Fort Worth area.
Usually, in phases. Perimeter work outside is the least disruptive; interior slab work means closing the section being worked on. Ask the provider to plan the sequence around your trading hours and agree closures and access routes before starting, so staff, customers and deliveries all know what to expect week by week.
That depends on the lease and the lender. Owners, landlords, tenants and sometimes an insurer all have an interest, and larger jobs are often scoped by an independent structural engineer whose report becomes the specification. Sort out who is approving what before the survey, because it changes what documentation the job needs to produce.
Building size, load, the depth supports have to reach, how much of the work is interior, and how much of it has to happen out of hours. A warehouse where equipment can drive to the wall is very different from a retail unit where everything comes through a single door after closing. The quote follows the survey and the agreed program.
When you call, mention the building type and your trading hours.